Elektros tiekimas Gas supply Water supply Waste water
Infrastructure

Draugystes Project is equipped with all infrastructure networks and allows custom connection solutions to cater for individual business needs.

  • Electricity supply
    • Power:up to 3MW
    Opportunity to connect up to 3MW of power supply without an additional investment.
  • Gas supply
    • Capacity:Up to 1000 m3
    The ability to connect up to 1000 m3 of daily gas supply without an additional investment.
  • Water supply
    Opportunity to install individual borehole and / or connect to city's water networks.
  • Waste water
    Possibility to install individual sewage treatment plants.